PT. YTL JAWA TIMUR
PAITON II POWER STATION

REQUIRE A PROFESSIONAL EMPLOYEE

Under Indonesia’s private power programme, PT. YTL Jawa Timur operates and
maintains this 2 x 610 MW Coal-fired Power Station. The station is located
at Paiton, Probolinggo District of East Java, 141 km Southeast of
Surabaya.

We currently have vacancies for:

CONTROL & INSTRUMENT TECHNICIAN – Code: C&I

You will be responsible to perform maintenance, troubleshooting and repair
of Field Control & Instrumentation equipment at Boiler & Turbines Plant
Area.

Candidate for this position should possess:
Minimum Diploma 3 years (D3) in Physics Engineering or Electronic from a
reputable local University / Polytechnic;
Having 3 years relevant experiences at heavy industries or power plants;
Good skill in instrumentation, control and automation system
troubleshooting;
Having good knowledge in control, instrumentation and automation equipment
(pneumatic, electronic and microprocessor bassed / smart system) and
familiar with Siemens and Allen Bradley PLCs and its Man machines
interfaces;
Accurate, reliable and enthusiasm;
Capable and willingness to work under pressure, extended working hours and
Call In scheme;
Good written and spoken English.

Remuneration and benefits will be comparable with the best in this
industrial sector.
Please submit a fully detailed CV in English, latest on 29 NOVEMBER 2008
to:

PT. YTL JAWA TIMUR
Tromol Pos No. 36
Paiton – Probolinggo, Jawa Timur 67291

Or recruitment@ ytljt.com

Your CV will be kept in strict confidence

Please include a contact telephone number and recent photograph.

Related posts:

  1. Job Vacancy WILMAR latest on 27th February 2010
  2. Migas, Mining, Power Sector
  3. Vacancy at LG Innotek Indonesia
  4. The Power of Effective Time Management
  5. Sales Engineer at Somit Automation
  6. Vacancy at MENSA GROUP PLANT DIRECTOR (PD)
  7. Job Vacancy at LG Innotek Indonesia
  8. Lowongan PEMODALAN NASIONAL MADANI(BUMN)-September 2008
  9. Technician Telecomunication Urgent
  10. Vacancy at PT. JAPAN AE POWER SYSTEMS INDONESIA

Leave a Reply